Era Ranger Uranium Mine tailings dredging
Reclaiming approximately 26.8 million tonnes of uranium tailings
Reclaiming approximately 26.8 million tonnes of uranium tailings
Constructing a 780-metre-long sub-surface cement bentonite cut-off wall
Removing mud and silts from ponds on the site of the future BLCP power station
Dredging approximately 4.5 million m3 of tailings