
Tailings dredging
Project Portfolio
Era Ranger Uranium Mine tailings dredging
Reclaiming approximately 26.8 million tonnes of uranium tailings
BLCP Project – Map Ta Phut Thailand
Removing mud and silts from ponds on the site of the future BLCP power station
Fortescue port facility tailings pond dredging
Dredging approximately 4.5 million m3 of tailings