Hall was initially invited to undertake the installation of HDPE pipelines for the Condabri Central Water Treatment Facility. The project involved construction of 2.4km of services trench, 6.4km of water pipeline and 8km of gas pipeline, ranging from 100mm to 610mm in diameter.
Due to our performance at Condabri, Hall was subsequently awarded the pipeline construction works at the Reedy Creek Permeate Treatment Facility. The scope involved the construction of 28 lines of water, gas and services totalling approximately 3.6km ranging from 50mm to 730mm in diameter. The scope was also extended to include trenching and cable installation of electrical and fibre optics.
Both projects required the ability to perform on a highly regulated site utilising all our own equipment. The Reedy Creek site also had extremely tight access and with multiple contractors on site requiring significant coordination