Condabri Central and Reedy Creek APLNG

Condabri & Reedy Creek (Surat Basin), Queensland

Construction and installation of gas and water gathering pipelines.

Condabri Central and Reedy Creek APLNG

#About this project

Hall was initially invited to undertake the installation of HDPE pipelines for the Condabri Central Water Treatment Facility. The project involved construction of 2.4km of services trench, 6.4km of water pipeline and 8km of gas pipeline, ranging from 100mm to 610mm in diameter.

Due to our performance at Condabri, Hall was subsequently awarded the pipeline construction works at the Reedy Creek Permeate Treatment Facility. The scope involved the construction of 28 lines of water, gas and services totalling approximately 3.6km ranging from 50mm to 730mm in diameter. The scope was also extended to include trenching and cable installation of electrical and fibre optics.

Both projects required the ability to perform on a highly regulated site utilising all our own equipment. The Reedy Creek site also had extremely tight access and with multiple contractors on site requiring significant coordination

#Project Data

  • LOCATION

    Condabri & Reedy Creek (Surat Basin), Queensland

  • CLIENT

    Origin Energy / Leighton Contractors

#Related Projects

FMG Port Facility Tailings Pond Dredging

Energy Resources & Mining

FMG Port Facility Tailings Pond Dredging

Dredging of approximately 4.5 million cubic metres from tailings ponds.

Port Towage Services – Tug Infrastructure Dredging

Energy Resources & Mining

Port Towage Services – Tug Infrastructure Dredging

Dredging an approach channel for the construction of the Tug Facility.

Hail Creek Mine Tailings Dredging

Energy Resources & Mining

Hail Creek Mine Tailings Dredging

Dredging of approximately 280,000m³ of sediment for Hail Creek Mine.

BLCP Project – Map Ta Phut Thailand

Energy Resources & Mining

BLCP Project – Map Ta Phut Thailand

The removal of mud and silts from ponds on the site of the future BLCP power station.