Pelican Waters pedestrian and cycle bridge

Pelican Waters

Construction of a 168-metre-long, five-span pedestrian and cycle bridge

Pelican Waters pedestrian and cycle bridge

#About this project

As part of its 30-year tenure at Pelican Waters on the Sunshine Coast, Hall has delivered a 168-metre-long, five-span pedestrian and cycle bridge for the development.

The bridge connects Bells Creek and the Sunshine Coast coastal pathway to the south with Pelican Waters Central Park to the north.

The bridge features a curved design, with both vertical and horizontal curves incorporated. This required extensive consultation and planning prior to and during construction and ensures there is enough height for boats to pass beneath the bridge safely, while also keeping the incline gentle enough to accommodate pedestrians, wheelchair users and prams.

#Project Data

  • LOCATION

    Pelican Waters

  • CLIENT

    Pelican Waters

#Related Projects

Aura – Precinct 2

Urban Development

Aura – Precinct 2

Construction of all civil works for a major Sunshine Coast residential project.

Brightwater Estate – Lake & Canal Construction

Urban Development

Brightwater Estate – Lake & Canal Construction

Award-nominated construction of the Brightwater Estate Lake and Canal.

Brightwater Stages 13 - 25

Urban Development

Brightwater Stages 13 - 25

Construction of 680 residential and commercial lots for a Sunshine Coast development.

Brightwater Trunk Sewer Rising Main

Urban Development

Brightwater Trunk Sewer Rising Main

Rising main installation including complex trenching and pipe welding.