Hall Contracting were contracted to carry out the Construction of a concrete lock and weir, including an elevated pedestrian bridge, a piled inlet structure to support salinity pipe system and pump station.
These works included 25,000m3 of bulk earthworks, 2,000m3 of structural concrete, floating pontoons, salinity intake structures, jetties and 280m of 1500 diameter GRP.