Hall was engaged to deliver civil works for the Bokarina Beach development, including constructing 300 residential lots and upgrading a feeder road for the development.

The project involved excavating a 27,000m3 extension to Lake Kawana as well as constructing roads; a 400-metre-long revetment wall; sewerage and water infrastructure; a jetty; a rising main; and a salinity pump station.

As part of the project’s species management plan, Hall translocated around 2,000m2 of vegetation to a designated area 400 metres from the site to ensure protected species like the wallum froglet and swamp crayfish weren’t negatively impacted.

Hall was named a 2020 Queensland State Finalist for the CCF Earth Awards for its efforts on this project.

#Project Data

  • LOCATION

    Bokarina, Sunshine Coast

  • CLIENT

    Stockland

#Related Projects

Aura – Precinct 2

Urban Development

Aura – Precinct 2

Construction of all civil works for a major Sunshine Coast residential project.

Brightwater Estate – Lake & Canal Construction

Urban Development

Brightwater Estate – Lake & Canal Construction

Award-nominated construction of the Brightwater Estate Lake and Canal.

Brightwater Stages 13 - 25

Urban Development

Brightwater Stages 13 - 25

Construction of 680 residential and commercial lots for a Sunshine Coast development.

Brightwater Trunk Sewer Rising Main

Urban Development

Brightwater Trunk Sewer Rising Main

Rising main installation including complex trenching and pipe welding.