Pelican Waters North Lock and Weir

Pelican Waters, Queensland

Constructing a 60-metre-long concrete weir and navigational lock system.

Pelican Waters North Lock and Weir

#About this project

As part of its long-standing relationship with Pelican Waters, Hall was engaged to construct a 60-metre-long concrete weir and navigational lock system for the development.

The 25-metre-long, 5-metre-wide lock system allows for small watercraft to safely access Pumicestone Passage by equalising the water levels between the canals and the waterway.

The team adhered to strict erosion and sediment control standards to manage acid sulfate soils at the site, while working adjacent to an environmentally sensitive marine park.

Hall’s efforts on this project were nationally recognised with the receipt of the 2005 Civil Contractors Federation (CCF) Earth Award.

#Project Data

  • LOCATION

    Pelican Waters, Queensland

  • CLIENT

    Cardno QLD Pty Ltd and Pelican Waters

#Related Projects

Aura – Precinct 2

Urban Development

Aura – Precinct 2

Construction of all civil works for a major Sunshine Coast residential project.

Brightwater Estate – Lake & Canal Construction

Urban Development

Brightwater Estate – Lake & Canal Construction

Award-nominated construction of the Brightwater Estate Lake and Canal.

Brightwater Stages 13 - 25

Urban Development

Brightwater Stages 13 - 25

Construction of 680 residential and commercial lots for a Sunshine Coast development.

Brightwater Trunk Sewer Rising Main

Urban Development

Brightwater Trunk Sewer Rising Main

Rising main installation including complex trenching and pipe welding.