Construction of a critical dredge pipeline and new service roads through Brisbane Airport.

Brisbane Airport New Parallel Runway Project

#About this project

Hall Contracting was engaged by international company Jan de Nul to deliver part of the $1.3 billion dollar New Parallel Runway Project. The project required the installation of 4km of 1000mm diameter steel pipeline through Brisbane International Airport, as well as the development of a Wastewater Treatment Plant.

A 4km x 11m access road was constructed to Main Roads specification, which was designed around operational runways including the main runway. The scope also included the installation of 270m of pipe underneath a runway and the construction of a 6 metre high, 40 metre long pipe bridge over an existing outfall structure.

In successfully completing this project, our team demonstrated their ability to work in a highly restricted and regulated airport environment. We also delivered innovative design, construction and fabrication solutions to save the project time and money.

#Project Data

  • LOCATION

    Brisbane Airport, Queensland

  • CLIENT

    Jan de Nul / Brisbane Airport Corporation

#Related Projects

Brisbane Airport Industrial Park (AIP) Stage 1

Aviation

Brisbane Airport Industrial Park (AIP) Stage 1

Delivery of extensive roadworks and services for NIOA and Brisbane Airport’s Pet Precinct.

Seawall and Site Access Roads

Aviation

Seawall and Site Access Roads

Construction of a new seawall to protect the Cribb Island foreshore.